Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Workforce Mecha-Tooling 3 Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
347,348,519.40
ISK
Sell Value
688,300,000.00
Profit
+340,951,480.60
ISK
Margin
49.5%
Build Time
9h 4m 1s
1 run

Materials

10 items
Material Quantity Unit Price Total
4 28,592,000.00
18 34,344,000.00
18 40,266,000.00
18 32,409,660.78
18 35,552,486.52
36 34,320,903.12
36 34,590,179.88
36 44,112,367.08
36 46,328,131.44
1,350 6,885,648.00
Material Total 337,401,376.82
System Cost Index (0.14%) 336,376.80
SCC Surcharge (4%) 9,610,765.78
Job Installation Cost 9,947,142.58
Grand Total 347,348,519.40

Production Timeline

d
Assembly 9h 4m 1s
1
Workforce Mecha-Tooling 3
Workforce Mecha-Tooling 3 M
1 job, 1 run 9h 4m 1s/job 9h 4m 1s
Total Wall Clock Time 9h 4m 1s

Required Skills

Industry IIIII