Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Pioneer Manufacturing

Blueprint Settings

Build Components

No buildable intermediates for this blueprint.

Manufacturing Facility Settings

Total Cost
4,117,330.30
ISK
Sell Value
4,374,851.66
Profit
+257,521.36
ISK
Margin
5.9%
Build Time
1h 21m 36s
1 run

Materials

4 items
Material Quantity Unit Price Total
3,600 865,332.00
18,000 1,037,160.00
54,000 987,120.00
288,000 1,077,120.00
Material Total 3,966,732.00
System Cost Index (0.14%) 5,092.70
SCC Surcharge (4%) 145,505.60
Job Installation Cost 150,598.30
Grand Total 4,117,330.30

Production Timeline

d
Assembly 1h 21m 36s
1
Pioneer
Pioneer M
1 job, 1 run 1h 21m 36s/job 1h 21m 36s
Total Wall Clock Time 1h 21m 36s

Required Skills