Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Odysseus Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
1,129,075,861.92
ISK
Sell Value
2,236,000,000.00
Profit
+1,106,924,138.08
ISK
Margin
49.5%
Build Time
1d 21h 20m
1 run

Materials

11 items
Material Quantity Unit Price Total
1 3,108,669.90
225 18,263,288.25
225 633,637,363.50
450 20,566,458.00
7,200 21,101,760.00
14,400 20,774,016.00
54,000 40,166,280.00
540,000 129,799,800.00
1,080,000 62,229,600.00
5,400,000 98,712,000.00
14,400,000 53,856,000.00
Material Total 1,102,215,235.65
System Cost Index (0.14%) 908,330.36
SCC Surcharge (4%) 25,952,295.91
Job Installation Cost 26,860,626.27
Grand Total 1,129,075,861.92

Production Timeline

d
Assembly 1d 21h 20m
1
Odysseus
Odysseus M
1 job, 1 run 1d 21h 20m/job 1d 21h 20m
Total Wall Clock Time 1d 21h 20m

Required Skills