Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Erratic Ore Mining Crystal Type A I Manufacturing

Blueprint Settings

Build Components

No buildable intermediates for this blueprint.

Manufacturing Facility Settings

Total Cost
345,826.35
ISK
Sell Value
418,791.30
Profit
+72,964.95
ISK
Margin
17.4%
Build Time
2m 44s
1 run

Materials

1 items
Material Quantity Unit Price Total
450 331,015.50
Material Total 331,015.50
System Cost Index (0.14%) 500.85
SCC Surcharge (4%) 14,310.00
Job Installation Cost 14,810.85
Grand Total 345,826.35

Production Timeline

d
Assembly 2m 44s
1
Erratic Ore Mining Crystal Type A I
Erratic Ore Mining Crystal Type A I M
1 job, 1 run 2m 44s/job 2m 44s
Total Wall Clock Time 2m 44s

Required Skills