Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Erratic Ore Mining Crystal Type B I Manufacturing

Blueprint Settings

Build Components

No buildable intermediates for this blueprint.

Manufacturing Facility Settings

Total Cost
432,650.73
ISK
Sell Value
359,900.00
Profit
-72,750.73
ISK
Margin
-20.2%
Build Time
2m 44s
1 run

Materials

1 items
Material Quantity Unit Price Total
563 414,137.17
Material Total 414,137.17
System Cost Index (0.14%) 626.06
SCC Surcharge (4%) 17,887.50
Job Installation Cost 18,513.56
Grand Total 432,650.73

Production Timeline

d
Assembly 2m 44s
1
Erratic Ore Mining Crystal Type B I
Erratic Ore Mining Crystal Type B I M
1 job, 1 run 2m 44s/job 2m 44s
Total Wall Clock Time 2m 44s

Required Skills