Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Erratic Ore Mining Crystal Type C I Manufacturing

Blueprint Settings

Build Components

No buildable intermediates for this blueprint.

Manufacturing Facility Settings

Total Cost
518,739.53
ISK
Sell Value
789,000.00
Profit
+270,260.48
ISK
Margin
34.3%
Build Time
2m 44s
1 run

Materials

1 items
Material Quantity Unit Price Total
675 496,523.25
Material Total 496,523.25
System Cost Index (0.14%) 751.28
SCC Surcharge (4%) 21,465.00
Job Installation Cost 22,216.28
Grand Total 518,739.53

Production Timeline

d
Assembly 2m 44s
1
Erratic Ore Mining Crystal Type C I
Erratic Ore Mining Crystal Type C I M
1 job, 1 run 2m 44s/job 2m 44s
Total Wall Clock Time 2m 44s

Required Skills