Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Erratic Ore Mining Crystal Type B II Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
242,013.55
ISK
Sell Value
1,100,000.00
Profit
+857,986.45
ISK
Margin
78.0%
Build Time
3m 56s
1 run

Materials

3 items
Material Quantity Unit Price Total
1 494.32
1 1.00
35 219,122.05
Material Total 219,617.37
System Cost Index (0.14%) 757.36
SCC Surcharge (4%) 21,638.82
Job Installation Cost 22,396.18
Grand Total 242,013.55

Production Timeline

d
Assembly 3m 56s
1
Erratic Ore Mining Crystal Type B II
Erratic Ore Mining Crystal Type B II M
1 job, 1 run 3m 56s/job 3m 56s
Total Wall Clock Time 3m 56s