Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Kestrel Manufacturing

Blueprint Settings

Build Components

No buildable intermediates for this blueprint.

Manufacturing Facility Settings

Total Cost
461,162.10
ISK
Sell Value
618,514.82
Profit
+157,352.72
ISK
Margin
25.4%
Build Time
54m 25s
1 run

Materials

4 items
Material Quantity Unit Price Total
28,800 107,712.00
5,400 98,712.00
2,250 129,645.00
450 108,166.50
Material Total 444,235.50
System Cost Index (0.14%) 572.40
SCC Surcharge (4%) 16,354.20
Job Installation Cost 16,926.60
Grand Total 461,162.10

Production Timeline

d
Assembly 54m 25s
1
Kestrel
Kestrel M
1 job, 1 run 54m 25s/job 54m 25s
Total Wall Clock Time 54m 25s

Required Skills