Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Typhoon Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
149,147,736.02
ISK
Sell Value
174,200,000.00
Profit
+25,052,263.98
ISK
Margin
14.4%
Build Time
2h 43m 12s
1 run

Materials

10 items
Material Quantity Unit Price Total
1 3,108,669.90
68 5,519,571.56
135 6,175,099.80
1,755 5,156,839.35
3,510 5,065,210.80
14,040 10,327,683.60
117,000 28,124,460.00
351,000 20,231,640.00
2,340,000 42,775,200.00
4,680,000 17,503,200.00
Material Total 143,987,575.01
System Cost Index (0.14%) 174,498.20
SCC Surcharge (4%) 4,985,662.81
Job Installation Cost 5,160,161.01
Grand Total 149,147,736.02

Production Timeline

d
Assembly 2h 43m 12s
1
Typhoon
Typhoon M
1 job, 1 run 2h 43m 12s/job 2h 43m 12s
Total Wall Clock Time 2h 43m 12s

Required Skills