Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

'Basic' Layered Energized Membrane Manufacturing

Blueprint Settings

Build Components

No buildable intermediates for this blueprint.

Manufacturing Facility Settings

Total Cost
65,786.50
ISK
Sell Value
24,850,000.00
Profit
+24,784,213.50
ISK
Margin
99.7%
Build Time
8m 10s
1 run

Materials

4 items
Material Quantity Unit Price Total
5,988 22,395.12
2,137 39,064.36
1 57.62
8 1,923.60
Material Total 63,440.70
System Cost Index (0.14%) 79.33
SCC Surcharge (4%) 2,266.47
Job Installation Cost 2,345.80
Grand Total 65,786.50

Production Timeline

d
Assembly 8m 10s
1
'Basic' Layered Energized Membrane
'Basic' Layered Energized Membrane M
1 job, 1 run 8m 10s/job 8m 10s
Total Wall Clock Time 8m 10s

Required Skills