Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Kinetic Energized Membrane II Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
328,050.57
ISK
Sell Value
645,775.35
Profit
+317,724.78
ISK
Margin
49.2%
Build Time
19m 9s
1 run

Materials

7 items
Material Quantity Unit Price Total
5 107,549.85
3 124,749.63
1 29,047.03
1 603.62
3 14,241.42
3 18,159.00
3 17,106.00
Material Total 311,456.55
System Cost Index (0.14%) 561.15
SCC Surcharge (4%) 16,032.87
Job Installation Cost 16,594.02
Grand Total 328,050.57

Production Timeline

d
Assembly 19m 9s
1
Kinetic Energized Membrane II
Kinetic Energized Membrane II M
1 job, 1 run 19m 9s/job 19m 9s
Total Wall Clock Time 19m 9s