Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Thermal Energized Membrane II Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
305,540.35
ISK
Sell Value
624,500.00
Profit
+318,959.65
ISK
Margin
51.1%
Build Time
19m 9s
1 run

Materials

5 items
Material Quantity Unit Price Total
5 107,549.85
3 124,749.63
1 603.62
6 34,212.00
1 23,550.00
Material Total 290,665.10
System Cost Index (0.14%) 503.03
SCC Surcharge (4%) 14,372.23
Job Installation Cost 14,875.25
Grand Total 305,540.35

Production Timeline

d
Assembly 19m 9s
1
Thermal Energized Membrane II
Thermal Energized Membrane II M
1 job, 1 run 19m 9s/job 19m 9s
Total Wall Clock Time 19m 9s