Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

800mm Steel Plates I Manufacturing

Blueprint Settings

Build Components

No buildable intermediates for this blueprint.

Manufacturing Facility Settings

Total Cost
690,120.45
ISK
Sell Value
696,900.00
Profit
+6,779.55
ISK
Margin
1.0%
Build Time
16m 20s
1 run

Materials

6 items
Material Quantity Unit Price Total
10,997 42,668.36
10,435 195,447.55
7,524 369,202.68
208 39,322.40
6 4,118.70
6 15,612.24
Material Total 666,371.93
System Cost Index (0.14%) 803.09
SCC Surcharge (4%) 22,945.43
Job Installation Cost 23,748.52
Grand Total 690,120.45

Production Timeline

d
Assembly 16m 20s
1
800mm Steel Plates I
800mm Steel Plates I M
1 job, 1 run 16m 20s/job 16m 20s
Total Wall Clock Time 16m 20s

Required Skills