Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Gravimetric ECM I Manufacturing

Blueprint Settings

Build Components

No buildable intermediates for this blueprint.

Manufacturing Facility Settings

Total Cost
31,760.45
ISK
Sell Value
57,963.24
Profit
+26,202.79
ISK
Margin
45.2%
Build Time
16m 20s
1 run

Materials

3 items
Material Quantity Unit Price Total
2 5,204.08
2,596 10,072.48
828 15,508.44
Material Total 30,785.00
System Cost Index (0.14%) 32.99
SCC Surcharge (4%) 942.47
Job Installation Cost 975.45
Grand Total 31,760.45

Production Timeline

d
Assembly 16m 20s
1
Gravimetric ECM I
Gravimetric ECM I M
1 job, 1 run 16m 20s/job 16m 20s
Total Wall Clock Time 16m 20s

Required Skills