Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Ultraviolet L Manufacturing

Blueprint Settings

Build Components

No buildable intermediates for this blueprint.

Manufacturing Facility Settings

Total Cost
64,799.76
ISK
Sell Value
34,000.00
Profit
-30,799.76
ISK
Margin
-90.6%
Build Time
8m 10s
1 run

Materials

5 items
Material Quantity Unit Price Total
18 52,606.44
94 1,718.32
2 480.90
3 2,231.01
4 5,770.56
Material Total 62,807.23
System Cost Index (0.14%) 67.38
SCC Surcharge (4%) 1,925.15
Job Installation Cost 1,992.53
Grand Total 64,799.76

Production Timeline

d
Assembly 8m 10s
1
Ultraviolet L
Ultraviolet L M
1 job, 1 run 8m 10s/job 8m 10s
Total Wall Clock Time 8m 10s

Required Skills