Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Falcon Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
138,521,775.93
ISK
Sell Value
148,874,842.77
Profit
+10,353,066.84
ISK
Margin
7.0%
Build Time
1d 7h 5m
1 run

Materials

11 items
Material Quantity Unit Price Total
338 16,109,870.92
135 2,618,001.00
52 1,373,229.52
446 8,078,005.52
3,375 16,958,261.25
68 623,696.00
17 10,874.56
Blackbird
1 8,005,000.00
1,620 67,375,022.40
270 8,631,945.90
27 3,359,844.63
Material Total 133,143,751.70
System Cost Index (0.14%) 181,865.55
SCC Surcharge (4%) 5,196,158.67
Job Installation Cost 5,378,024.23
Grand Total 138,521,775.93

Production Timeline

d
Assembly 1d 7h 5m
1
Falcon
Falcon M
1 job, 1 run 1d 7h 5m/job 1d 7h 5m
Total Wall Clock Time 1d 7h 5m