Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Falcon Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
135,609,522.78
ISK
Sell Value
149,094,498.38
Profit
+13,484,975.60
ISK
Margin
9.0%
Build Time
1d 7h 5m
1 run

Materials

11 items
Material Quantity Unit Price Total
338 12,206,065.56
135 2,916,718.20
52 1,066,520.00
446 9,022,580.00
3,375 20,428,875.00
68 645,651.84
17 10,146.62
Blackbird
1 7,667,536.59
1,620 65,624,725.80
270 7,870,246.20
27 2,684,341.62
Material Total 130,143,407.43
System Cost Index (0.14%) 184,844.48
SCC Surcharge (4%) 5,281,270.87
Job Installation Cost 5,466,115.35
Grand Total 135,609,522.78

Production Timeline

d
Assembly 1d 7h 5m
1
Falcon
Falcon M
1 job, 1 run 1d 7h 5m/job 1d 7h 5m
Total Wall Clock Time 1d 7h 5m