Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Barrage S Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
115,846.13
ISK
Sell Value
249,450.00
Profit
+133,603.87
ISK
Margin
53.6%
Build Time
39m 17s
1 run

Materials

4 items
Material Quantity Unit Price Total
270 13,119.30
108 76,464.00
1 661.10
1 19,392.60
Material Total 109,637.00
System Cost Index (0.14%) 209.97
SCC Surcharge (4%) 5,999.16
Job Installation Cost 6,209.13
Grand Total 115,846.13

Production Timeline

d
Assembly 39m 17s
1
Barrage S
Barrage S M
1 job, 1 run 39m 17s/job 39m 17s
Total Wall Clock Time 39m 17s

Required Skills