Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Barrage S Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
121,901.25
ISK
Sell Value
254,850.00
Profit
+132,948.75
ISK
Margin
52.2%
Build Time
39m 17s
1 run

Materials

4 items
Material Quantity Unit Price Total
270 12,012.30
108 81,644.76
1 652.98
1 21,509.97
Material Total 115,820.01
System Cost Index (0.14%) 205.65
SCC Surcharge (4%) 5,875.59
Job Installation Cost 6,081.24
Grand Total 121,901.25

Production Timeline

d
Assembly 39m 17s
1
Barrage S
Barrage S M
1 job, 1 run 39m 17s/job 39m 17s
Total Wall Clock Time 39m 17s

Required Skills