Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Quake L Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
1,939,544.38
ISK
Sell Value
2,321,750.00
Profit
+382,205.62
ISK
Margin
16.5%
Build Time
1h 57m 50s
1 run

Materials

4 items
Material Quantity Unit Price Total
5,400 240,030.00
1,350 1,020,559.50
1 652.98
27 580,736.52
Material Total 1,841,979.00
System Cost Index (0.14%) 3,299.31
SCC Surcharge (4%) 94,266.07
Job Installation Cost 97,565.38
Grand Total 1,939,544.38

Production Timeline

d
Assembly 1h 57m 50s
1
Quake L
Quake L M
1 job, 1 run 1h 57m 50s/job 1h 57m 50s
Total Wall Clock Time 1h 57m 50s

Required Skills