Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Quake M Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
780,526.23
ISK
Sell Value
919,500.00
Profit
+138,973.77
ISK
Margin
15.1%
Build Time
1h 18m 34s
1 run

Materials

4 items
Material Quantity Unit Price Total
2,160 96,012.00
540 408,223.80
1 652.98
11 236,596.36
Material Total 741,485.14
System Cost Index (0.14%) 1,320.23
SCC Surcharge (4%) 37,720.86
Job Installation Cost 39,041.09
Grand Total 780,526.23

Production Timeline

d
Assembly 1h 18m 34s
1
Quake M
Quake M M
1 job, 1 run 1h 18m 34s/job 1h 18m 34s
Total Wall Clock Time 1h 18m 34s

Required Skills