Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Tremor M Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
781,960.99
ISK
Sell Value
624,000.00
Profit
-157,960.99
ISK
Margin
-25.3%
Build Time
1h 18m 34s
1 run

Materials

4 items
Material Quantity Unit Price Total
2,160 96,098.40
540 408,510.00
1 652.98
11 237,658.52
Material Total 742,919.90
System Cost Index (0.14%) 1,320.23
SCC Surcharge (4%) 37,720.86
Job Installation Cost 39,041.09
Grand Total 781,960.99

Production Timeline

d
Assembly 1h 18m 34s
1
Tremor M
Tremor M M
1 job, 1 run 1h 18m 34s/job 1h 18m 34s
Total Wall Clock Time 1h 18m 34s

Required Skills