Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Barrage M Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
501,832.58
ISK
Sell Value
758,400.00
Profit
+256,567.42
ISK
Margin
33.8%
Build Time
1h 18m 34s
1 run

Materials

4 items
Material Quantity Unit Price Total
1,080 52,477.20
432 305,856.00
1 661.10
6 116,355.60
Material Total 475,349.90
System Cost Index (0.14%) 895.55
SCC Surcharge (4%) 25,587.13
Job Installation Cost 26,482.68
Grand Total 501,832.58

Production Timeline

d
Assembly 1h 18m 34s
1
Barrage M
Barrage M M
1 job, 1 run 1h 18m 34s/job 1h 18m 34s
Total Wall Clock Time 1h 18m 34s

Required Skills