Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Barrage M Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
530,291.23
ISK
Sell Value
717,100.00
Profit
+186,808.77
ISK
Margin
26.1%
Build Time
1h 18m 34s
1 run

Materials

4 items
Material Quantity Unit Price Total
1,080 48,006.00
432 326,579.04
1 652.98
6 129,052.56
Material Total 504,290.58
System Cost Index (0.14%) 879.25
SCC Surcharge (4%) 25,121.40
Job Installation Cost 26,000.65
Grand Total 530,291.23

Production Timeline

d
Assembly 1h 18m 34s
1
Barrage M
Barrage M M
1 job, 1 run 1h 18m 34s/job 1h 18m 34s
Total Wall Clock Time 1h 18m 34s

Required Skills