Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Barrage L Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
1,234,160.01
ISK
Sell Value
1,968,150.00
Profit
+733,989.99
ISK
Margin
37.3%
Build Time
1h 57m 50s
1 run

Materials

4 items
Material Quantity Unit Price Total
2,700 131,193.00
1,080 764,640.00
1 661.10
14 271,496.40
Material Total 1,167,990.50
System Cost Index (0.14%) 2,237.62
SCC Surcharge (4%) 63,931.90
Job Installation Cost 66,169.51
Grand Total 1,234,160.01

Production Timeline

d
Assembly 1h 57m 50s
1
Barrage L
Barrage L M
1 job, 1 run 1h 57m 50s/job 1h 57m 50s
Total Wall Clock Time 1h 57m 50s

Required Skills