Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Null M Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
322,569.73
ISK
Sell Value
554,700.00
Profit
+232,130.27
ISK
Margin
41.8%
Build Time
1h 18m 34s
1 run

Materials

4 items
Material Quantity Unit Price Total
216 163,289.52
1 652.98
216 14,983.92
6 129,052.56
Material Total 307,978.98
System Cost Index (0.14%) 493.41
SCC Surcharge (4%) 14,097.34
Job Installation Cost 14,590.75
Grand Total 322,569.73

Production Timeline

d
Assembly 1h 18m 34s
1
Null M
Null M M
1 job, 1 run 1h 18m 34s/job 1h 18m 34s
Total Wall Clock Time 1h 18m 34s

Required Skills