Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Javelin M Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
364,236.53
ISK
Sell Value
543,550.00
Profit
+179,313.47
ISK
Margin
33.0%
Build Time
1h 18m 34s
1 run

Materials

4 items
Material Quantity Unit Price Total
270 194,270.40
540 38,631.60
1 660.90
6 112,777.14
Material Total 346,340.04
System Cost Index (0.14%) 605.20
SCC Surcharge (4%) 17,291.29
Job Installation Cost 17,896.49
Grand Total 364,236.53

Production Timeline

d
Assembly 1h 18m 34s
1
Javelin M
Javelin M M
1 job, 1 run 1h 18m 34s/job 1h 18m 34s
Total Wall Clock Time 1h 18m 34s

Required Skills