Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Spike M Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
398,052.31
ISK
Sell Value
535,300.00
Profit
+137,247.69
ISK
Margin
25.6%
Build Time
1h 18m 34s
1 run

Materials

4 items
Material Quantity Unit Price Total
270 204,111.90
540 46,429.20
1 652.98
6 129,059.82
Material Total 380,253.90
System Cost Index (0.14%) 601.88
SCC Surcharge (4%) 17,196.53
Job Installation Cost 17,798.41
Grand Total 398,052.31

Production Timeline

d
Assembly 1h 18m 34s
1
Spike M
Spike M M
1 job, 1 run 1h 18m 34s/job 1h 18m 34s
Total Wall Clock Time 1h 18m 34s

Required Skills