Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Spike L Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
972,560.06
ISK
Sell Value
1,478,600.00
Profit
+506,039.94
ISK
Margin
34.2%
Build Time
1h 57m 50s
1 run

Materials

4 items
Material Quantity Unit Price Total
675 510,279.75
1,350 116,046.00
1 652.98
14 301,122.64
Material Total 928,101.37
System Cost Index (0.14%) 1,503.43
SCC Surcharge (4%) 42,955.26
Job Installation Cost 44,458.69
Grand Total 972,560.06

Production Timeline

d
Assembly 1h 57m 50s
1
Spike L
Spike L M
1 job, 1 run 1h 57m 50s/job 1h 57m 50s
Total Wall Clock Time 1h 57m 50s

Required Skills