Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Reactor Control Unit II Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
425,091.80
ISK
Sell Value
470,445.11
Profit
+45,353.31
ISK
Margin
9.6%
Build Time
19m 9s
1 run

Materials

6 items
Material Quantity Unit Price Total
1 21,509.97
1 16,710.00
3 124,749.63
3 30,717.15
5 216,166.80
1 518.01
Material Total 410,371.56
System Cost Index (0.14%) 497.79
SCC Surcharge (4%) 14,222.45
Job Installation Cost 14,720.24
Grand Total 425,091.80

Production Timeline

d
Assembly 19m 9s
1
Reactor Control Unit II
Reactor Control Unit II M
1 job, 1 run 19m 9s/job 19m 9s
Total Wall Clock Time 19m 9s

Required Skills