Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Ladar Sensor Cluster Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
17,589.35
ISK
Sell Value
16,924.29
Profit
-665.06
ISK
Margin
-3.9%
Build Time
1m 18s
1 run

Materials

3 items
Material Quantity Unit Price Total
20 976.40
2 12,521.26
1 3,655.55
Material Total 17,153.21
System Cost Index (0.14%) 14.75
SCC Surcharge (4%) 421.39
Job Installation Cost 436.14
Grand Total 17,589.35

Production Timeline

d
Assembly 1m 18s
1
Ladar Sensor Cluster
Ladar Sensor Cluster M
1 job, 1 run 1m 18s/job 1m 18s
Total Wall Clock Time 1m 18s

Required Skills