Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Ballistic Control System II Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
670,667.52
ISK
Sell Value
949,101.66
Profit
+278,434.14
ISK
Margin
29.3%
Build Time
19m 9s
1 run

Materials

6 items
Material Quantity Unit Price Total
1 10,270.36
5 107,543.80
5 75,011.85
1 91,576.65
9 364,889.52
1 411.50
Material Total 649,703.68
System Cost Index (0.14%) 708.92
SCC Surcharge (4%) 20,254.92
Job Installation Cost 20,963.84
Grand Total 670,667.52

Production Timeline

d
Assembly 19m 9s
1
Ballistic Control System II
Ballistic Control System II M
1 job, 1 run 19m 9s/job 19m 9s
Total Wall Clock Time 19m 9s