Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Absolution Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
252,412,790.63
ISK
Sell Value
280,311,627.91
Profit
+27,898,837.28
ISK
Margin
10.0%
Build Time
1d 14h 52m
1 run

Materials

11 items
Material Quantity Unit Price Total
270 5,807,235.60
108 3,142,800.00
878 36,507,327.80
405 8,049,800.25
1,620 70,038,124.20
270 2,594,430.00
21 12,534.06
10,125 46,587,352.50
Harbinger
1 50,520,000.00
54 5,977,911.78
513 12,593,960.19
Material Total 241,831,476.38
System Cost Index (0.14%) 357,822.22
SCC Surcharge (4%) 10,223,492.03
Job Installation Cost 10,581,314.25
Grand Total 252,412,790.63

Production Timeline

d
Assembly 1d 14h 52m
1
Absolution
Absolution M
1 job, 1 run 1d 14h 52m/job 1d 14h 52m
Total Wall Clock Time 1d 14h 52m