Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Aeon Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
24,057,316,166.34
ISK
Sell Value
0.00
Profit
-24,057,316,166.34
ISK
Margin
0.0%
Build Time
37d 18h 40m
1 run

Materials

18 items
Material Quantity Unit Price Total
45 591,300,000.00
36 357,930,486.36
113 1,959,420,000.00
90 1,117,800,000.00
90 1,219,500,000.00
23 291,848,489.25
90 1,638,227,848.50
225 1,372,500,000.00
9 107,714,380.14
45 374,148,235.80
90 1,434,600,000.00
45 609,750,000.00
58 1,008,620,000.00
113 9,740,600,000.00
720 33,148,620.00
360 29,139,012.00
9 1,517,000,000.04
1 29,990,000.00
Material Total 23,433,237,072.09
System Cost Index (0.14%) 21,104,123.96
SCC Surcharge (4%) 602,974,970.29
Job Installation Cost 624,079,094.25
Grand Total 24,057,316,166.34

Production Timeline

d
Assembly 37d 18h 40m
1
Aeon
Aeon M
1 job, 1 run 37d 18h 40m/job 37d 18h 40m
Total Wall Clock Time 37d 18h 40m

Required Skills