Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Reprocessing Array Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
53,794,048.51
ISK
Sell Value
88,880,000.00
Profit
+35,085,951.49
ISK
Margin
39.5%
Build Time
3h 37m 37s
1 run

Materials

1 items
Material Quantity Unit Price Total
1 53,000,000.00
Material Total 53,000,000.00
System Cost Index (0.14%) 26,851.88
SCC Surcharge (4%) 767,196.63
Job Installation Cost 794,048.51
Grand Total 53,794,048.51

Production Timeline

d
Assembly 3h 37m 37s
1
Reprocessing Array
Reprocessing Array M
1 job, 1 run 3h 37m 37s/job 3h 37m 37s
Total Wall Clock Time 3h 37m 37s

Required Skills