Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Rorqual Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
3,071,562,188.37
ISK
Sell Value
3,602,000,000.00
Profit
+530,437,811.63
ISK
Margin
14.7%
Build Time
12d 14h 13m
1 run

Materials

18 items
Material Quantity Unit Price Total
1 191,074,074.07
5 72,200,000.00
5 54,027,322.40
5 72,738,022.80
5 65,351,788.00
5 33,415,000.00
5 158,002,331.60
9 108,810,000.00
9 125,640,000.00
9 164,160,000.00
14 262,076,646.72
14 171,654,376.46
18 272,880,000.00
27 390,632,553.18
27 518,137,714.17
36 257,112,000.00
180 14,610,630.60
360 16,453,166.40
Material Total 2,948,975,626.40
System Cost Index (0.14%) 4,145,439.29
SCC Surcharge (4%) 118,441,122.68
Job Installation Cost 122,586,561.97
Grand Total 3,071,562,188.37

Production Timeline

d
Assembly 12d 14h 13m
1
Rorqual
Rorqual M
1 job, 1 run 12d 14h 13m/job 12d 14h 13m
Total Wall Clock Time 12d 14h 13m

Required Skills