Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Dual 150mm Railgun II Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
1,028,586.24
ISK
Sell Value
1,585,642.10
Profit
+557,055.86
ISK
Margin
35.1%
Build Time
38m 18s
1 run

Materials

5 items
Material Quantity Unit Price Total
14 301,122.64
14 273,690.90
1 1,042.00
5 411,456.45
1 653.79
Material Total 987,965.78
System Cost Index (0.14%) 1,373.64
SCC Surcharge (4%) 39,246.82
Job Installation Cost 40,620.46
Grand Total 1,028,586.24

Production Timeline

d
Assembly 38m 18s
1
Dual 150mm Railgun II
Dual 150mm Railgun II M
1 job, 1 run 38m 18s/job 38m 18s
Total Wall Clock Time 38m 18s

Required Skills