Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Polarized Heavy Neutron Blaster Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
2,298,142.27
ISK
Sell Value
3,044,225.26
Profit
+746,082.99
ISK
Margin
24.5%
Build Time
38m 18s
1 run

Materials

5 items
Material Quantity Unit Price Total
9 193,578.84
9 162,187.02
2 164,582.58
1 1,661,000.00
1 653.79
Material Total 2,182,002.23
System Cost Index (0.14%) 3,927.44
SCC Surcharge (4%) 112,212.60
Job Installation Cost 116,140.04
Grand Total 2,298,142.27

Production Timeline

d
Assembly 38m 18s
1
Polarized Heavy Neutron Blaster
Polarized Heavy Neutron Blaster M
1 job, 1 run 38m 18s/job 38m 18s
Total Wall Clock Time 38m 18s

Required Skills