Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Polarized Neutron Blaster Cannon Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
6,929,534.27
ISK
Sell Value
17,455,620.44
Profit
+10,526,086.17
ISK
Margin
60.3%
Build Time
57m 27s
1 run

Materials

5 items
Material Quantity Unit Price Total
7 150,561.32
16 288,332.48
7 576,039.03
1 5,641,547.17
1 653.79
Material Total 6,657,133.79
System Cost Index (0.14%) 9,211.61
SCC Surcharge (4%) 263,188.87
Job Installation Cost 272,400.48
Grand Total 6,929,534.27

Production Timeline

d
Assembly 57m 27s
1
Polarized Neutron Blaster Cannon
Polarized Neutron Blaster Cannon M
1 job, 1 run 57m 27s/job 57m 27s
Total Wall Clock Time 57m 27s

Required Skills