Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Polarized 425mm AutoCannon Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
1,821,041.67
ISK
Sell Value
1,799,000.00
Profit
-22,041.67
ISK
Margin
-1.2%
Build Time
38m 18s
1 run

Materials

5 items
Material Quantity Unit Price Total
8 150,369.52
1 1,278,799.47
2 168,040.00
8 151,320.88
1 668.59
Material Total 1,749,198.46
System Cost Index (0.14%) 2,429.48
SCC Surcharge (4%) 69,413.73
Job Installation Cost 71,843.21
Grand Total 1,821,041.67

Production Timeline

d
Assembly 38m 18s
1
Polarized 425mm AutoCannon
Polarized 425mm AutoCannon M
1 job, 1 run 38m 18s/job 38m 18s
Total Wall Clock Time 38m 18s

Required Skills