Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Polarized 800mm Repeating Cannon Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
4,780,179.08
ISK
Sell Value
4,490,781.57
Profit
-289,397.51
ISK
Margin
-6.4%
Build Time
57m 27s
1 run

Materials

5 items
Material Quantity Unit Price Total
16 310,281.60
1 3,811,000.00
2 164,368.26
15 283,745.40
1 678.98
Material Total 4,570,074.24
System Cost Index (0.14%) 7,104.99
SCC Surcharge (4%) 202,999.85
Job Installation Cost 210,104.84
Grand Total 4,780,179.08

Production Timeline

d
Assembly 57m 27s
1
Polarized 800mm Repeating Cannon
Polarized 800mm Repeating Cannon M
1 job, 1 run 57m 27s/job 57m 27s
Total Wall Clock Time 57m 27s

Required Skills