Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Polarized 800mm Repeating Cannon Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
4,708,160.70
ISK
Sell Value
4,397,325.15
Profit
-310,835.55
ISK
Margin
-7.1%
Build Time
57m 27s
1 run

Materials

5 items
Material Quantity Unit Price Total
16 344,140.16
1 3,778,000.00
2 164,582.58
15 232,002.45
1 653.79
Material Total 4,519,378.98
System Cost Index (0.14%) 6,383.92
SCC Surcharge (4%) 182,397.79
Job Installation Cost 188,781.72
Grand Total 4,708,160.70

Production Timeline

d
Assembly 57m 27s
1
Polarized 800mm Repeating Cannon
Polarized 800mm Repeating Cannon M
1 job, 1 run 57m 27s/job 57m 27s
Total Wall Clock Time 57m 27s

Required Skills