Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Deprecated Ore Prospecting Array 4 Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
149,822,339.98
ISK
Sell Value
368,400,000.00
Profit
+218,577,660.02
ISK
Margin
59.3%
Build Time
9h 4m 1s
1 run

Materials

9 items
Material Quantity Unit Price Total
4 28,584,000.00
8 17,896,000.00
8 15,803,182.40
9 17,105,421.60
9 11,028,091.77
9 16,200,998.73
12 11,440,292.28
12 11,530,640.04
12 15,442,710.48
Material Total 145,031,337.30
System Cost Index (0.14%) 162,014.58
SCC Surcharge (4%) 4,628,988.09
Job Installation Cost 4,791,002.68
Grand Total 149,822,339.98

Production Timeline

d
Assembly 9h 4m 1s
1
Deprecated Ore Prospecting Array 4
Deprecated Ore Prospecting Array 4 M
1 job, 1 run 9h 4m 1s/job 9h 4m 1s
Total Wall Clock Time 9h 4m 1s

Required Skills