Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Deprecated Ore Prospecting Array 4 Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
154,330,354.05
ISK
Sell Value
367,200,000.00
Profit
+212,869,645.95
ISK
Margin
58.0%
Build Time
9h 4m 1s
1 run

Materials

9 items
Material Quantity Unit Price Total
4 33,416,000.00
8 17,730,298.88
8 14,665,510.40
9 16,367,164.47
9 13,077,185.85
9 16,763,120.19
12 12,656,361.00
12 11,680,402.68
12 13,080,000.00
Material Total 149,436,043.47
System Cost Index (0.14%) 165,508.09
SCC Surcharge (4%) 4,728,802.49
Job Installation Cost 4,894,310.58
Grand Total 154,330,354.05

Production Timeline

d
Assembly 9h 4m 1s
1
Deprecated Ore Prospecting Array 4
Deprecated Ore Prospecting Array 4 M
1 job, 1 run 9h 4m 1s/job 9h 4m 1s
Total Wall Clock Time 9h 4m 1s

Required Skills