Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

CONCORD Ion Siege Blaster Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
265,219,602.33
ISK
Sell Value
441,185,714.29
Profit
+175,966,111.96
ISK
Margin
39.9%
Build Time
5h 26m 24s
1 run

Materials

4 items
Material Quantity Unit Price Total
1 196,300,000.00
6 13,418,244.00
10 18,003,139.50
20 25,738,860.00
Material Total 253,460,243.50
System Cost Index (0.14%) 397,659.48
SCC Surcharge (4%) 11,361,699.35
Job Installation Cost 11,759,358.83
Grand Total 265,219,602.33

Production Timeline

d
Assembly 5h 26m 24s
1
CONCORD Ion Siege Blaster
CONCORD Ion Siege Blaster M
1 job, 1 run 5h 26m 24s/job 5h 26m 24s
Total Wall Clock Time 5h 26m 24s

Required Skills