Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

CONCORD Dual 1000mm Railgun Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
295,101,088.30
ISK
Sell Value
547,700,000.00
Profit
+252,598,911.70
ISK
Margin
46.1%
Build Time
5h 26m 24s
1 run

Materials

4 items
Material Quantity Unit Price Total
1 226,600,000.00
6 13,422,000.00
10 18,001,109.70
20 25,737,850.80
Material Total 283,760,960.50
System Cost Index (0.14%) 383,482.58
SCC Surcharge (4%) 10,956,645.21
Job Installation Cost 11,340,127.80
Grand Total 295,101,088.30

Production Timeline

d
Assembly 5h 26m 24s
1
CONCORD Dual 1000mm Railgun
CONCORD Dual 1000mm Railgun M
1 job, 1 run 5h 26m 24s/job 5h 26m 24s
Total Wall Clock Time 5h 26m 24s

Required Skills