Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Pharolux Cyno Beacon Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
420,848,205.03
ISK
Sell Value
745,609,090.91
Profit
+324,760,885.88
ISK
Margin
43.6%
Build Time
4d 11h 40m
1 run

Materials

6 items
Material Quantity Unit Price Total
1 42,030,000.00
1 50,178,888.89
1 83,030,000.00
2 79,215,384.62
2 110,000,000.00
450,000 39,784,500.00
Material Total 404,238,773.51
System Cost Index (0.14%) 561,671.60
SCC Surcharge (4%) 16,047,759.92
Job Installation Cost 16,609,431.52
Grand Total 420,848,205.03

Production Timeline

d
Assembly 4d 11h 40m
1
Pharolux Cyno Beacon
Pharolux Cyno Beacon M
1 job, 1 run 4d 11h 40m/job 4d 11h 40m
Total Wall Clock Time 4d 11h 40m

Required Skills