Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Pharolux Cyno Beacon Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
323,954,402.22
ISK
Sell Value
649,751,219.51
Profit
+325,796,817.29
ISK
Margin
50.1%
Build Time
4d 11h 40m
1 run

Materials

6 items
Material Quantity Unit Price Total
1 25,140,000.00
1 31,610,000.00
1 75,880,000.00
2 57,920,000.00
2 79,400,000.00
450,000 42,115,500.00
Material Total 312,065,500.00
System Cost Index (0.14%) 402,040.17
SCC Surcharge (4%) 11,486,862.05
Job Installation Cost 11,888,902.22
Grand Total 323,954,402.22

Production Timeline

d
Assembly 4d 11h 40m
1
Pharolux Cyno Beacon
Pharolux Cyno Beacon M
1 job, 1 run 4d 11h 40m/job 4d 11h 40m
Total Wall Clock Time 4d 11h 40m

Required Skills