Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Ansiblex Jump Bridge Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
571,314,650.21
ISK
Sell Value
1,274,000,000.00
Profit
+702,685,349.79
ISK
Margin
55.2%
Build Time
5d 9h 12m
1 run

Materials

6 items
Material Quantity Unit Price Total
1 50,178,888.89
1 55,000,000.00
1 34,020,000.00
2 0.02
3 249,090,000.00
4 158,430,769.24
Material Total 546,719,658.15
System Cost Index (0.14%) 831,714.71
SCC Surcharge (4%) 23,763,277.35
Job Installation Cost 24,594,992.06
Grand Total 571,314,650.21

Production Timeline

d
Assembly 5d 9h 12m
1
Ansiblex Jump Bridge
Ansiblex Jump Bridge M
1 job, 1 run 5d 9h 12m/job 5d 9h 12m
Total Wall Clock Time 5d 9h 12m

Required Skills