Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Azbel Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
2,254,143,928.81
ISK
Sell Value
3,839,000,000.00
Profit
+1,584,856,071.19
ISK
Margin
41.3%
Build Time
6d 17h 4m
1 run

Materials

12 items
Material Quantity Unit Price Total
4 100,560,000.00
4 126,440,000.00
4 101,320,000.00
4 236,800,000.00
4 101,480,000.00
4 340,800,000.00
4 80,840,000.00
4 108,840,000.00
4 137,240,000.00
6 173,760,000.00
8 412,775,384.64
8 200,320,000.00
Material Total 2,121,175,384.64
System Cost Index (0.14%) 4,496,520.82
SCC Surcharge (4%) 128,472,023.35
Job Installation Cost 132,968,544.17
Grand Total 2,254,143,928.81

Production Timeline

d
Assembly 6d 17h 4m
1
Azbel
Azbel M
1 job, 1 run 6d 17h 4m/job 6d 17h 4m
Total Wall Clock Time 6d 17h 4m

Required Skills