Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Athanor Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
530,178,886.08
ISK
Sell Value
705,447,945.21
Profit
+175,269,059.13
ISK
Margin
24.8%
Build Time
3d 14h 8m
1 run

Materials

8 items
Material Quantity Unit Price Total
1 39,607,692.31
1 42,030,000.00
1 50,190,000.00
1 33,140,000.00
1 33,340,000.00
1 55,000,000.00
1 83,030,000.00
3 170,940,000.00
Material Total 507,277,692.31
System Cost Index (0.14%) 774,436.50
SCC Surcharge (4%) 22,126,757.27
Job Installation Cost 22,901,193.77
Grand Total 530,178,886.08

Production Timeline

d
Assembly 3d 14h 8m
1
Athanor
Athanor M
1 job, 1 run 3d 14h 8m/job 3d 14h 8m
Total Wall Clock Time 3d 14h 8m

Required Skills