Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Standup L-Set Bomb Aimer II Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
4,676,177,861.63
ISK
Sell Value
0.00
Profit
-4,676,177,861.63
ISK
Margin
0.0%
Build Time
6h 8m 14s
1 run

Materials

11 items
Material Quantity Unit Price Total
1 653.79
54 30,285,295.20
54 3,903,660.00
54 57,986,848.62
1,350 1,418,754,555.00
1,350 461,287,723.50
1,350 96,082,092.00
1,350 21,266,982.00
10,125 2,008,220,141.25
10,125 539,178,120.00
10,125 9,793,710.00
Material Total 4,646,759,781.36
System Cost Index (0.14%) 994,814.31
SCC Surcharge (4%) 28,423,265.96
Job Installation Cost 29,418,080.27
Grand Total 4,676,177,861.63

Production Timeline

d
Assembly 6h 8m 14s
1
Standup L-Set Bomb Aimer II
Standup L-Set Bomb Aimer II M
1 job, 1 run 6h 8m 14s/job 6h 8m 14s
Total Wall Clock Time 6h 8m 14s

Required Skills