Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Leviathan Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
124,905,869,057.08
ISK
Sell Value
0.00
Profit
-124,905,869,057.08
ISK
Margin
0.0%
Build Time
56d 16h
1 run

Materials

21 items
Material Quantity Unit Price Total
1 20,230,000,000.00
23 4,394,703,703.61
72 1,039,680,000.00
90 1,302,108,510.60
135 1,963,926,615.60
173 3,693,675,938.81
180 1,944,983,606.40
180 1,285,560,000.00
225 17,631,576,922.50
270 3,264,300,000.00
270 3,528,996,552.00
270 4,924,800,000.00
360 5,025,600,000.00
360 3,372,340,086.00
450 14,220,209,844.00
450 8,635,628,569.50
450 10,894,500,000.00
450 8,423,892,216.00
450 5,517,462,100.50
1,440 116,885,044.80
2,880 131,625,331.20
Material Total 121,542,455,041.52
System Cost Index (0.14%) 113,738,638.21
SCC Surcharge (4%) 3,249,675,377.36
Job Installation Cost 3,363,414,015.56
Grand Total 124,905,869,057.08

Production Timeline

d
Assembly 56d 16h
1
Leviathan
Leviathan M
1 job, 1 run 56d 16h/job 56d 16h
Total Wall Clock Time 56d 16h

Required Skills