Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

True Sansha Capital Energy Nosferatu Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
152,942,237.30
ISK
Sell Value
0.00
Profit
-152,942,237.30
ISK
Margin
0.0%
Build Time
5h 26m 24s
1 run

Materials

7 items
Material Quantity Unit Price Total
1 140,700,000.00
9 2,614,607.19
9 27,207.09
27 1,087,252.47
27 13,655.79
54 1,534,759.92
54 103,324.14
Material Total 146,080,806.60
System Cost Index (0.14%) 232,029.06
SCC Surcharge (4%) 6,629,401.64
Job Installation Cost 6,861,430.70
Grand Total 152,942,237.30

Production Timeline

d
Assembly 5h 26m 24s
1
True Sansha Capital Energy Nosferatu
True Sansha Capital Energy Nosferatu M
1 job, 1 run 5h 26m 24s/job 5h 26m 24s
Total Wall Clock Time 5h 26m 24s

Required Skills