Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Dark Blood Capital Energy Nosferatu Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
183,682,169.78
ISK
Sell Value
1,200,000,000.00
Profit
+1,016,317,830.22
ISK
Margin
84.7%
Build Time
5h 26m 24s
1 run

Materials

7 items
Material Quantity Unit Price Total
1 173,900,000.00
9 1,548,900.00
9 0.81
27 143,478.00
27 13,530.78
54 1,090,800.00
54 43,248.60
Material Total 176,739,958.19
System Cost Index (0.14%) 234,760.78
SCC Surcharge (4%) 6,707,450.81
Job Installation Cost 6,942,211.59
Grand Total 183,682,169.78

Production Timeline

d
Assembly 5h 26m 24s
1
Dark Blood Capital Energy Nosferatu
Dark Blood Capital Energy Nosferatu M
1 job, 1 run 5h 26m 24s/job 5h 26m 24s
Total Wall Clock Time 5h 26m 24s

Required Skills