Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Modal Enduring Triple Neutron Blaster Cannon Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
49,096,923.18
ISK
Sell Value
0.00
Profit
-49,096,923.18
ISK
Margin
0.0%
Build Time
5h 26m 24s
1 run

Materials

4 items
Material Quantity Unit Price Total
1 45,960,000.00
27 28,622.70
31 109,586.24
32 62,670.08
Material Total 46,160,879.02
System Cost Index (0.14%) 99,286.52
SCC Surcharge (4%) 2,836,757.65
Job Installation Cost 2,936,044.16
Grand Total 49,096,923.18

Production Timeline

d
Assembly 5h 26m 24s
1
Modal Enduring Triple Neutron Blaster Cannon
Modal Enduring Triple Neutron Blaster Cannon M
1 job, 1 run 5h 26m 24s/job 5h 26m 24s
Total Wall Clock Time 5h 26m 24s

Required Skills